 "id": "us-bop-terrehaute-deaerator",
 "country": "United States",
 "language": "English",
 "buyer": "U.S. Department of Justice, Federal Bureau of Prisons (Field Acquisition Office, Grand Prairie TX) for FCC Terre Haute, Indiana",
 "project": "Replace DA Surge Tanks, FCC Terre Haute central utility plant, solicitation IFBP04181500005, project 4A9Z",
 "year": "2015",
 "files": [
  {
   "file": "A IFBP04181500005 SOLICITATION PACKAGE REP DA SURGE TANKS FCC THX.pdf",
   "pages": 38,
   "text_layer": true,
   "what_it_is": "Solicitation IFBP04181500005 (issued April 10, 2015; bids due May 13, 2015): bid instructions, SF-1442 (10/193 calendar days), schedule (one lump-sum line), bonds, magnitude $500K-$1M, FAR clauses (no liquidated damages clause), attachments list."
  },
  {
   "file": "B IFBP04181500005 NCIC SECURITY CHECK FORMS REP DA TANKS FCC THX.pdf",
   "pages": 3,
   "text_layer": false,
   "what_it_is": "NCIC security check forms for site visit. Noise for pricing the vessels."
  },
  {
   "file": "C IFBP04181500005 WAGE RATES REPLACE DA SURGE TANKS FCC THX.pdf",
   "pages": 16,
   "text_layer": true,
   "what_it_is": "Davis-Bacon construction wage rates (replaced by Amendment 1). Noise for the vessels."
  },
  {
   "file": "D IFBP04181500005 SOW REPLACE DA SURGE TANKS FCC THX.pdf",
   "pages": 19,
   "text_layer": false,
   "what_it_is": "Statement of Work / specification, Section 01 11 00, Project 4A9Z, Dec 17, 2014; scanned, no text layer. Technical scope on pp. 2-3 (items A-K); rest is Bureau procedures, submittals, warranty, closeout."
  },
  {
   "file": "E IFBP04181500005 DRAWINGS REPLACE DA SURGE TANKS FCC THX.pdf",
   "pages": 2,
   "text_layer": false,
   "what_it_is": "Two scanned, rotated vendor reference sheets (Shipco): p. 1 pressurized deaerator with four boiler feed pumps; p. 2 surge (make-up water) tank with pumps. No text layer."
  },
  {
   "file": "F IFBP04181500005 SF 28 AFFIDAVIT OF INDIVIDUAL SURETY REP DA TANKS FCC THX.pdf",
   "pages": 2,
   "text_layer": true,
   "what_it_is": "SF 28 affidavit of individual surety (blank form). Noise."
  },
  {
   "file": "F IFBP04181500005 SF24 BID BOND REP DA TANKS FCC THX.pdf",
   "pages": 2,
   "text_layer": true,
   "what_it_is": "SF 24 bid bond (blank form). Noise."
  },
  {
   "file": "IFBP04181500005 AMEND ONE REPLACE DA SURGE TANKS FCC TERRE HAUTE.pdf",
   "pages": 3,
   "text_layer": true,
   "what_it_is": "Amendment 1 (May 5, 2015): new wage rates, SOW additions (hour meters, counter-flow trays, <30 ppb O2, sample cooler), adds photos; bid date not extended."
  },
  {
   "file": "IFBP04181500005 PHOTOS AMEND ONE DA SURGE TANK PHOTOS.pdf",
   "pages": 11,
   "text_layer": false,
   "what_it_is": "Amendment 1 photos of the existing combined tank in the central utility plant (April 30, 2015). No specifications legible; nameplate unreadable."
  },
  {
   "file": "IFBP04181500005 WAGE RATES AMEND ONE DA SURGE TANKS.pdf",
   "pages": 16,
   "text_layer": true,
   "what_it_is": "Amendment 1 wage rates (IN150003 mod 5). Noise for the vessels."
  },
  {
   "file": "IFBP04181500005_CLAR_SET_ONE_REPLACE_DA_SURGE_TANKS_FCC_TERRE_HAUTE.pdf",
   "pages": 2,
   "text_layer": true,
   "what_it_is": "Clarification Set One (May 5, 2015): downtime, electrical, temporary tie-in, vent valve, chemical injection points; informational only."
  },
  {
   "file": "IFBP04181500005_PRE_BID_MIN_REP_DA_SURGE_TANKS_FCC_THX.pdf",
   "pages": 5,
   "text_layer": true,
   "what_it_is": "Pre-bid conference minutes (April 28, 2015) with sign-in sheet; pp. 2-4 are scans; informational only."
  }
 ],
 "quality": "All technical content is a 19-page scanned SOW and two rotated scanned vendor sheets with no text layer; no design pressure, temperature or code is given for either vessel, the vendor sheets disagree with the SOW capacities, the binding changes sit in a one-page amendment, and most of the package is federal forms and wage rates.",
 "read_by": "Mavlon, read from the documents with AI help before any run, November 2026",
 "items": [
  "Replacement pressurized deaerator: horizontal stand-alone 304L stainless receiver on an elevated stand, counter-flow tray type with two steam supplies, 133,000 lb/hr per SOW, <30 ppb dissolved oxygen, four boiler feed pumps, sample cooler, 304L piping",
  "Replacement surge tank: 3,220 gallon 304L stainless receiver on an elevated stand with two transfer pumps and deaerator bypass capability; whether it is pressurized is not stated (vendor sheet shows vent and overflow)",
  "Contractor works around the vessels: removal of the existing combined surge/deaerator tank, temporary surge/deaerator system, installation and tie-ins, boil-out, third-party boiler inspection, start-up, three-year warranty"
 ],
 "checks": [
  {
   "n": 1,
   "area": "scope",
   "check": "What is being replaced and with what?",
   "answer": "The existing combined surge and deaerator tank is removed and disposed of by the Contractor and replaced by two separate units: a pressurized deaerator (horizontal, stand-alone, separate from the surge tank) and a surge tank (SOW p. 2, items B, D, G). The work is a construction contract: one lump-sum line item 0001 (solicitation p. 9).",
   "evidence": "D IFBP04181500005 SOW REPLACE DA SURGE TANKS FCC THX.pdf, p. 2 (quote read from image)",
   "quote": "Contractor will remove the existing combined surge and deaerator tank from the Central Utility Plant and dispose of the tank properly."
  },
  {
   "n": 2,
   "area": "design",
   "check": "Deaerator capacity (as written in the SOW)",
   "answer": "133,000 lb/hr and '2650 net gallons per hour' (unit as written). The vendor reference sheet shows 117,000 lb/hr and 2,340 net receiver gallons (see contradictions).",
   "evidence": "D IFBP04181500005 SOW REPLACE DA SURGE TANKS FCC THX.pdf, p. 2 (quote read from image)",
   "quote": "The replacement pressurized Deaerator,133,000 lbs./hr., and 2650 net gallons per hour"
  },
  {
   "n": 3,
   "area": "materials",
   "check": "Deaerator receiver material and support",
   "answer": "304L stainless steel receiver on an elevated stand; horizontal stand-alone unit.",
   "evidence": "D IFBP04181500005 SOW REPLACE DA SURGE TANKS FCC THX.pdf, p. 2 (quote read from image)",
   "quote": "will be constructed with 304L stainless steel receiver on an elevated stand"
  },
  {
   "n": 4,
   "area": "fabrication",
   "check": "Deaerator internals (governing, with Amendment 1)",
   "answer": "Tray-type deaerator with two steam supplies (SOW item E); Amendment 1 adds that it shall be a counter-flow tray system.",
   "evidence": "IFBP04181500005 AMEND ONE REPLACE DA SURGE TANKS FCC TERRE HAUTE.pdf, p. 3",
   "quote": "The tray style system shall be a counter flow tray style system."
  },
  {
   "n": 5,
   "area": "design",
   "check": "Deaerator outlet dissolved oxygen (Amendment 1)",
   "answer": "Feedwater dissolved oxygen less than 30 parts per billion (added to SOW item E by Amendment 1).",
   "evidence": "IFBP04181500005 AMEND ONE REPLACE DA SURGE TANKS FCC TERRE HAUTE.pdf, p. 3",
   "quote": "The tank needs to provide a quality of feed water less than 30 parts per billion of dissolved oxygen."
  },
  {
   "n": 6,
   "area": "scope",
   "check": "Boiler feed pumps on the deaerator stand",
   "answer": "Four boiler feed water pumps, at least 160 psi discharge, 105 gpm, 25 hp, 3500 rpm, 460 V three-phase (SOW item D). Amendment 1 adds hour meters on the pump motor control panel.",
   "evidence": "D IFBP04181500005 SOW REPLACE DA SURGE TANKS FCC THX.pdf, p. 2 (quote read from image)",
   "quote": "four boiler feed water pumps with a discharge pressure of at least 160 p.s.i., 105 gallons per minute, 25 h.p., 3500 r.p.m."
  },
  {
   "n": 7,
   "area": "scope",
   "check": "Sample cooler (Amendment 1)",
   "answer": "A sample cooler on the deaerator discharge, added as SOW item L by Amendment 1 (the pre-bid minutes had noted it was not in the SOW).",
   "evidence": "IFBP04181500005 AMEND ONE REPLACE DA SURGE TANKS FCC TERRE HAUTE.pdf, p. 3",
   "quote": "Install a sample cooler on the discharge of the DA."
  },
  {
   "n": 8,
   "area": "nozzles",
   "check": "Deaerator piping, valves and gaskets",
   "answer": "All deaerator piping 304L stainless steel, flanged and welded fittings; valves 'raising steam 350 pound rated' (as written); metal gaskets on every flanged connection.",
   "evidence": "D IFBP04181500005 SOW REPLACE DA SURGE TANKS FCC THX.pdf, p. 2 (quote read from image)",
   "quote": "All piping on the deaerator will be 304L stainless steel flanged and welded fittings. The valves will be raising steam 350 pound rated valves."
  },
  {
   "n": 9,
   "area": "scope",
   "check": "Surge tank size, material and pumps",
   "answer": "3,220 gallon receiver of 304L stainless steel on an elevated stand, with two transfer pumps (35 psig discharge, 275 gpm, 15 hp, 1750 rpm, 460 three-phase). It must also be able to bypass the deaerator to feed the boilers during a deaerator inspection (item H).",
   "evidence": "D IFBP04181500005 SOW REPLACE DA SURGE TANKS FCC THX.pdf, p. 2 (quote read from image)",
   "quote": "The Surge tank will be a 3,220 gallon receiver constructed of 304L stainless steel on elevated stand."
  },
  {
   "n": 10,
   "area": "design",
   "check": "Is the surge tank a pressure vessel?",
   "answer": "Not stated. No design pressure is given for the surge tank and the SOW uses 'pressurized' only for the deaerator; the vendor sheet for the surge tank (titled 'Central Utility Plant Make-up Water') shows a 4 in. vent and a 4 in. overflow. The documents do not say whether it is atmospheric, so whether it is a pressure vessel cannot be confirmed. Verified by reading all 19 SOW pages and both drawing pages as images.",
   "evidence": "E IFBP04181500005 DRAWINGS REPLACE DA SURGE TANKS FCC THX.pdf, p. 2 (quote read from image)",
   "quote": "D x L GAL. INLET OVERFLOW VENT DRAIN MAKEUP"
  },
  {
   "n": 11,
   "area": "code",
   "check": "Code, design pressure, design temperature, stamp, National Board",
   "answer": "Not stated for either vessel. No ASME code, design pressure, design temperature, MAWP, code stamp or National Board registration appears anywhere. The only pressure words are 'pressurized' deaerator, pump discharge pressures, '350 pound rated' valves and a '150 lb' flange on the surge tank sheet. Verified by reading every page of the scanned SOW (19) and drawings (2) as images, and searching the text layers of the solicitation, Amendment 1, clarification set and pre-bid minutes (image pages 2-4 of the minutes viewed).",
   "evidence": "D IFBP04181500005 SOW REPLACE DA SURGE TANKS FCC THX.pdf, p. 2 (quote read from image)",
   "quote": "The replacement pressurized Deaerator"
  },
  {
   "n": 12,
   "area": "documents",
   "check": "Inspection",
   "answer": "The Contractor is responsible for a third-party inspection by a certified boiler inspector and for all documentation throughout the service. No inspection standard is named.",
   "evidence": "D IFBP04181500005 SOW REPLACE DA SURGE TANKS FCC THX.pdf, p. 3 (quote read from image)",
   "quote": "Contractor will be responsible for a third party inspection by a certified boiler inspector and provide all documentation throughout the service."
  },
  {
   "n": 13,
   "area": "testing",
   "check": "Boil-out",
   "answer": "Full boil-out (48 hours) if oil-based preservatives were used; reduced to 24 hours if it is confirmed none were applied. No hydrostatic test is specified.",
   "evidence": "D IFBP04181500005 SOW REPLACE DA SURGE TANKS FCC THX.pdf, p. 3 (quote read from image)",
   "quote": "If it can be confirmed that no oil-based preservatives were applied, then the boil-out procedure can be reduced from 48 hours to 24."
  },
  {
   "n": 14,
   "area": "scope",
   "check": "Turnkey and start-up",
   "answer": "Deaerator and surge tanks are a turnkey operation that must meet or exceed the existing system after installation, including system start-up of the tanks.",
   "evidence": "D IFBP04181500005 SOW REPLACE DA SURGE TANKS FCC THX.pdf, p. 3 (quote read from image)",
   "quote": "The Deaerator and Surge Tanks are to be a “turnkey” operation which after installation meets or exceeds the existing system."
  },
  {
   "n": 15,
   "area": "commercial",
   "check": "Warranty",
   "answer": "Minimum three-year parts and labor warranty on all work (SOW item K), in addition to the FAR 52.246-21 construction warranty of one year from substantial completion (SOW p. 17).",
   "evidence": "D IFBP04181500005 SOW REPLACE DA SURGE TANKS FCC THX.pdf, p. 3 (quote read from image)",
   "quote": "It shall have a minimum of three year parts and labor warranty on all work performed."
  },
  {
   "n": 16,
   "area": "scope",
   "check": "Temporary surge/deaerator system",
   "answer": "Contractor provides a temporary surge/deaerator system to keep steam service running, including piping, valves, tie-in points, chemical treatment, and labor to install and remove it (confirmed in Clarification 3). Downtime is very limited in winter (Clarification 1).",
   "evidence": "D IFBP04181500005 SOW REPLACE DA SURGE TANKS FCC THX.pdf, p. 2 (quote read from image)",
   "quote": "Contractor will provide a temporary Surge/Deaerator System in order to maintain continuous steam service to FCC Terre Haute."
  },
  {
   "n": 17,
   "area": "nozzles",
   "check": "Chemical injection points and vent",
   "answer": "Chemical injection points on both ends below the water line, as per drawings; the vent is a valve, not a fixed orifice. Both are clarifications, issued for information only.",
   "evidence": "IFBP04181500005_CLAR_SET_ONE_REPLACE_DA_SURGE_TANKS_FCC_TERRE_HAUTE.pdf, p. 2",
   "quote": "Chemical injection points will be on both ends below the water line as per drawings."
  },
  {
   "n": 18,
   "area": "geometry",
   "check": "Deaerator vendor reference sheet",
   "answer": "Shipco .005 DA-ISTP / .005 DA-ISTP-2T 'pressurized design' sheet: standard receiver 72 x 168, 2,340 net gallons, 3,390 boiler hp, 117,000 lb/hr (10-minute storage basis), approximate overall 234 long x 92 wide x 154 high (units not stated); 'H' based on 48 in. elevation. Marked 'Drawing for reference use only' and 'All dimensions are approximate'.",
   "evidence": "E IFBP04181500005 DRAWINGS REPLACE DA SURGE TANKS FCC THX.pdf, p. 1 (quote read from image)",
   "quote": "72 x 168 2,340 3,390 117,000 234 92 154"
  },
  {
   "n": 19,
   "area": "nozzles",
   "check": "Surge tank vendor sheet connections",
   "answer": "Surge tank sheet: D x L 72 x 168, 3210 gal; overflow 4 in. CLP, vent 4 in. CLP, drain 2-1/2 in. CLP, make-up 2-1/2 in.; condensate dump on a 150 lb 6 in. 8-bolt flange. The inlet flange size in the table is not clearly legible on the scan (6 or 8 in.), so it is left out.",
   "evidence": "E IFBP04181500005 DRAWINGS REPLACE DA SURGE TANKS FCC THX.pdf, p. 2 (quote read from image)",
   "quote": "150 lb 6\", 8-bolt FLANGE CONDENSATE DUMP"
  },
  {
   "n": 20,
   "area": "commercial",
   "check": "Performance period",
   "answer": "Begin within 10 calendar days and complete within 193 calendar days after notice to proceed; the period is mandatory (SF-1442 block 11).",
   "evidence": "A IFBP04181500005 SOLICITATION PACKAGE REP DA SURGE TANKS FCC THX.pdf, p. 6",
   "quote": "The Contractor shall begin performance 10 calendar days and complete it within 193 calendar days after receiving"
  },
  {
   "n": 21,
   "area": "commercial",
   "check": "Liquidated damages",
   "answer": "No liquidated damages rate is stated. The solicitation has no liquidated damages clause (the word does not appear in its 38-page text layer), yet the SOW closeout text refers to the date on which liquidated damages cease.",
   "evidence": "D IFBP04181500005 SOW REPLACE DA SURGE TANKS FCC THX.pdf, p. 18 (quote read from image)",
   "quote": "If issued after the contract completion date, the certificate establishes the date upon which liquidated damages cease."
  },
  {
   "n": 22,
   "area": "commercial",
   "check": "Bonds and magnitude",
   "answer": "Bid bond 20% of bid price, not to exceed $3,000,000; performance and payment bonds each 100% of contract price within 10 days of award. Project magnitude $500,000 to $1,000,000 (same page).",
   "evidence": "A IFBP04181500005 SOLICITATION PACKAGE REP DA SURGE TANKS FCC THX.pdf, p. 13",
   "quote": "in the form of twenty percent (20) of the bid price or not to exceed $3,000,000"
  },
  {
   "n": 23,
   "area": "commercial",
   "check": "Domestic material",
   "answer": "Buy American - Construction Materials (FAR 52.225-9) applies; the bid is a 100% small business set-aside under NAICS 238220 (solicitation p. 2).",
   "evidence": "A IFBP04181500005 SOLICITATION PACKAGE REP DA SURGE TANKS FCC THX.pdf, p. 22",
   "quote": "52.225-9 Buy American - Construction Materials (May2014)"
  },
  {
   "n": 24,
   "area": "documents",
   "check": "Submittals before fabrication",
   "answer": "Submittals (shop drawings, product data, certificates, test or inspection reports) within 10 calendar days after commencement; no fabrication before written COR acceptance except at the Contractor's risk; COR returns submittals in about 15 calendar days (SOW p. 10).",
   "evidence": "A IFBP04181500005 SOLICITATION PACKAGE REP DA SURGE TANKS FCC THX.pdf, p. 14",
   "quote": "shall not take place until written acceptance is given by the COR, except at the Contractor's own risk."
  },
  {
   "n": 25,
   "area": "scope",
   "check": "Which documents change the requirements",
   "answer": "Amendment 1 (May 5, 2015) is the only binding change: new wage rates, SOW 1.1 items D (hour meters), E (counter-flow trays, <30 ppb dissolved oxygen) and new L (sample cooler), plus photos; bid date not extended. The pre-bid minutes (April 29, 2015) and Clarification Set One (May 5, 2015) are informational only.",
   "evidence": "IFBP04181500005_CLAR_SET_ONE_REPLACE_DA_SURGE_TANKS_FCC_TERRE_HAUTE.pdf, p. 1",
   "quote": "These clarifications are for informational purposes only."
  }
 ],
 "contradictions": [
  {
   "topic": "Deaerator steam capacity",
   "side_a": "SOW 1.1.D: \"The replacement pressurized Deaerator,133,000 lbs./hr.\"",
   "side_a_evidence": "D IFBP04181500005 SOW REPLACE DA SURGE TANKS FCC THX.pdf, p. 2 (quote read from image)",
   "side_b": "Vendor reference sheet, capacity table (lb/hr Steam column): \"117,000\"",
   "side_b_evidence": "E IFBP04181500005 DRAWINGS REPLACE DA SURGE TANKS FCC THX.pdf, p. 1 (quote read from image)",
   "why_it_matters": "Capacity sets the tray section and vessel size; the reference unit is rated lower than the SOW asks for.",
   "status": "confirmed"
  },
  {
   "topic": "Deaerator storage volume",
   "side_a": "SOW 1.1.D (unit as written): \"2650 net gallons per hour\"",
   "side_a_evidence": "D IFBP04181500005 SOW REPLACE DA SURGE TANKS FCC THX.pdf, p. 2 (quote read from image)",
   "side_b": "Vendor reference sheet, NET RECEIVER GALLONS column: \"2,340\"",
   "side_b_evidence": "E IFBP04181500005 DRAWINGS REPLACE DA SURGE TANKS FCC THX.pdf, p. 1 (quote read from image)",
   "why_it_matters": "Storage volume drives shell size and weight; the SOW figure is larger and its 'per hour' unit is unclear.",
   "status": "confirmed"
  },
  {
   "topic": "Surge tank volume",
   "side_a": "SOW 1.1.G: \"The Surge tank will be a 3,220 gallon receiver\"",
   "side_a_evidence": "D IFBP04181500005 SOW REPLACE DA SURGE TANKS FCC THX.pdf, p. 2 (quote read from image)",
   "side_b": "Surge tank vendor sheet, GAL. column: \"3210\"",
   "side_b_evidence": "E IFBP04181500005 DRAWINGS REPLACE DA SURGE TANKS FCC THX.pdf, p. 2 (quote read from image)",
   "why_it_matters": "Small difference (10 gallons), but the bid must state which volume is supplied.",
   "status": "confirmed"
  }
 ]
}