 "id": "italy-terni-hospital",
 "country": "Italy",
 "language": "Italian",
 "convention": "IEC/CEI",
 "text_layer": false,
 "quality": "clean vector CAD with text turned into strokes (no text layer); small ratings need 200 dpi or more",
 "buyer": "Azienda Ospedaliera Santa Maria di Terni",
 "project": "Potenziamento della cabina elettrica DEU per alimentazione del gruppo frigo (Delibera DG 375/2024, CUP I41B24000060005)",
 "drawing": "Delibera_375_2024_AOSP_Terni_cabina_MT-BT_DEU.pdf, page 228 (drawing 22-420-E02, Schema generale - progetto); existing state on page 227",
 "read_by": "Mavlon, read from the drawing with AI help before any run, November 2026",
 "checks": [
  [
   "MV switchboard",
   "CE03 in Cabina DEU with 5 cubicles QM03 to QM07"
  ],
  [
   "QM03",
   "line isolator (sezionamento linea) from Cabina OSP, stall QM18"
  ],
  [
   "QM04",
   "line isolator from Cabina ASM, stall QM01"
  ],
  [
   "QM05, QM06, QM07",
   "transformer feeders (sezionamento linea trasformatore) with circuit breakers"
  ],
  [
   "MV switching devices",
   "Siemens 3AH 630 A on all five cubicles; QM03/QM04 switch-disconnectors with earthing switch and door interlock, QM05-07 circuit breakers with shunt trip and undervoltage release"
  ],
  [
   "Transformer feeder protection",
   "SIF5600 relay with 50, 51 and 51N on QM05, QM06, QM07"
  ],
  [
   "MV cables",
   "RG7H1R 12/20 kV 3(1x95) on all five cubicles"
  ],
  [
   "Transformers",
   "3 x 630 kVA, 10/0.4 kV (TR01, TR02, TR03), each with temperature device 26"
  ],
  [
   "Transformer LV cables",
   "TR01 3(3x1x240)+2x1x185 L=17 m; TR02 3(4x1x240)+2x240 L=10 m; TR03 3(3x1x240)+2x185 L=10 m"
  ],
  [
   "Gensets",
   "2 x 550 kVA (gruppo elettrogeno)"
  ],
  [
   "Genset board (Quadro G.E.)",
   "2 x 4x1000 A Tmax T6N breakers set at 630 A"
  ],
  [
   "Genset cables",
   "3x3x1x240+3x1x120, L=150 m each"
  ],
  [
   "Paralleling board (Quadro parallelo)",
   "2 x 4x1250 A incomers and a 4x1250 A tie, ABB DMTM-I-485-72 meters"
  ],
  [
   "Power Center incomers",
   "Q1, Q2, Q3: 4x1250 A, 50 kA, from TR1, TR2, TR3, thermal setting 800 A, key interlocks A1, A2, A3"
  ],
  [
   "Power Center couplers",
   "CG.1 and CG.2, 4x1600 A, key interlocked so that at most two transformers run in parallel"
  ],
  [
   "Power Center other devices",
   "Q5 4x1250 A Tmax S7D; Q6 and Q6.1 4x1600 A T7D motor-operated; QF.5 and QF.6 3Nx32 A"
  ],
  [
   "Automatic transfer",
   "ABB ATS021 automatic changeover device"
  ],
  [
   "New section QGCDZ fault level",
   "Ik = 28.3 kA"
  ],
  [
   "New chiller feeder",
   "QAB.1 4x800 A to the new chiller (frigo nuovo), cable 3x(4x1x240)+2x1x240, about 100 m"
  ],
  [
   "Emergency section",
   "QGBTE (Matricola ELTE 558/03 schema 2766-E01) with outgoing feeders to lifts, lighting, operating theatres and similar"
  ],
  [
   "Emergency extension",
   "QGBTE-A, about 30 outgoing feeders QAB.1 to QAB.30, many marked riserva (spare)"
  ],
  [
   "PLC",
   "Quadro PLC for alarm and load management, RS-485 links from the meters"
  ],
  [
   "Paralleling limit note",
   "with both gensets running, the load current must stay under about 1250 A, otherwise non-priority loads are shed"
  ]
 ]
}