SHEET 1/7

For Custom Machine Builders & Special-Purpose Machinery

Every machine is custom.
Every quote shouldn't be.

The first question on every RFQ is the same: have we built this before? Mavlon answers it from your own past jobs - with confidence scores, modular reuse, and long-lead component flags - in hours, not weeks.

Packaging LinesFiller · Capper · Palletizer
Medical DeviceCatheter · Syringe · IV
SemiconductorWafer · EFEM · Loadlock
Aerospace ToolingJig · Fixture · ATL · NDI
EV BatteryCell · Module · Pack
Food & BeverageProcess · Hygienic
Special-PurposeSPM · One-off
Defense & EnergyTest Rigs · Assembly

NDA-first · 3 past machines to start · Pilot in one week

MAVLON SHEET 1 / 7 CUSTOM MACHINERY · FEASIBILITY REV 1.0 · 2026

The 70 / 30 truth

Most "custom" machines are 70% modular.

The frame, the drive train, the indexer, the safety guard package, the HMI shell, the control cabinet, the standard pneumatics - they carry over from your past builds. You've designed them a hundred times. The risk doesn't live there.

The 30% that's genuinely customer-specific - the workhead, the tooling, the vision system tuned to a new part, the cycle balance for a new throughput target - that's where every senior engineer spends their judgement. And that's exactly where mistakes get multi-million.

Mavlon helps you quote both halves with confidence. The 70% gets recalled in seconds from your library. The 30% gets flagged for review with the closest historical analogue surfaced - even when there isn't one.

70 % MODULAR 30% CUSTOM FRAME · DRIVE · INDEXER SAFETY · HMI · CABINET WORKHEAD · TOOLING VISION · CYCLE BALANCE MODULAR REUSE CUSTOMER-SPECIFIC
The RFQ Packet

One drawing. One spec.
The same question: have we done this?

BASE FRAME · 2400 × 800mm CONTROL CABINET DIAL · 8-pos WORKHEAD NEW VISION SYS. 2× 5MP CCD · NEW HMI · 15" FESTO PICK · NEW SPEC SPM-2028-V · CATHETER ASSEMBLY · 8 POS DIAL · 1800 PPH SPM · ASSEMBLY SPM-2028-V REV - DRAFT
Modular Base
~70%
Customer-Specific
~30%
Turnaround
4–8 weeks

Senior engineer recognizes the dial-table architecture. Cabinet, HMI, pneumatics - known. Workhead, vision, pick robot - new. The quote slows down right there.

Mavlon - within the hour

The feasibility verdict
the moment you upload.

Project
SPM-2028-V  ·  8-pos Dial Catheter Assembly  ·  1800 PPH target
Past Match
SPM-Cath-2024-A · 84% match · same dial, different workhead
Modular Reuse
68% of BOM - frame, cabinet, indexer, HMI, pneumatics carry over
Genuinely New
Workhead (catheter tip forming)  ·  Vision (2× 5MP CCD)  ·  Pick robot (1800 PPH spec)
Process Cap.
Cpk 1.33 target  ·  Closest historical: 1.41 (Cath-2024-A)
Long Leads
Bosch Rexroth indexer · 18 wks  ·  SMC valve manifold · 12 wks
Spec Flags
ISO 13485 traceability (med device)  ·  FDA 21 CFR 11 audit trail
Feasibility
High confidence (84%)  ·  New workhead drives risk - 3 prior builds analogous
Estimate
$4.2M  ·  ±$340K band  ·  17% margin  ·  3 line items flagged

The three quote-killers in custom machinery.

Custom machine builders don't lose on simple machines they've done a hundred times. They lose on the three blind spots that hide inside every new RFQ - the ones that don't surface until detail design has already started.

1
MISSED: Long-lead component
The Indexer That Wasn't Available
Quote assumed standard Bosch Rexroth indexer at 8-week lead. By detail design, supplier quoted 18 weeks. Schedule shifted. Customer penalty clause triggered. Margin evaporated trying to expedite via spot buy.
↳ $480K eaten · 10 weeks slip · penalty + expedite
2
MIS-PRICED: Modular reuse
The "We've Done This" That Hadn't
Quoted assuming workhead carried over from previous build. Senior engineer remembered "similar" job. Turned out vision system spec was different, pick robot was different, cycle target was tighter. All three were the 30% that breaks the analogue. Re-estimate killed the margin.
↳ -22% margin · 6 weeks redesign · customer trust eroded
3
UNKNOWN: Process capability
The Cpk That Wasn't Achievable
Customer required Cpk 1.67 on new feature. Quote was based on past builds at Cpk 1.33. The architecture couldn't get there without redesign of the workhead and added inspection station. Discovered in tryout - too late.
↳ $720K rework · 14 weeks slip · runoff failed twice
RISK ANALYSIS SHEET 3 / 7 CLASSIFICATION: CRITICAL SOURCE: CUSTOM MACHINE BUILDER INTERVIEWS

The long-lead components that decide schedules.

Mavlon cross-checks every machine you quote against current supplier lead times - pulled from your past PO data and live supplier feeds. Slip risk gets flagged in the quote, not in detail design.

Component Common Suppliers Lead (typ.) Slip risk surfaced by Mavlon
Servo Drives & Motors Siemens · Bosch Rexroth · Yaskawa 16–22 wks Cross-checked against your last 12 POs; flagged if quote assumes <16 wks
High-Precision Indexers Weiss · CDS Manufacturing · Stelron 14–20 wks Recurring slip vector - Mavlon surfaces alternative spec families
Vision Systems & Cameras Cognex · Keyence · Basler · Allied Vision 8–14 wks Spec match against your library; integration risk scored from past builds
Robots & Cobots FANUC · KUKA · ABB · UR · Yaskawa 10–16 wks Payload & reach cross-checked against new product spec
Custom-Cast Frames In-house · Local fabricator 6–12 wks Modular reuse check - >65% of frames in your library carry forward
PLC & HMI Hardware Siemens · Rockwell · B&R · Beckhoff 4–10 wks Carries over for >80% of builds - Mavlon flags the rare new spec

The same custom-machine RFQ.
Two realities.

Your Engineering Today With Mavlon
RFQ-to-quote turnaround4–8 weeks per RFQHours to a day
"Have we built this before?"Senior engineer's memoryVector recall + confidence score
Modular reuse calculationSenior eyeball, hopefulAuto-mapped against your BOM library
Customer-specific risk flagFound in detail designSurfaced at quote time
Long-lead component checkProcurement called after POCross-checked vs. past POs & live feeds
Process capability vs. pastBest guessPast Cpk vs. spec target, per feature
Margin band confidence±20% gut±5–10% backed by historical outcomes
Senior engineer dependencyEvery RFQ from scratchJunior drafts; senior approves the new 30%
Where IP livesIn retiring engineers' headsOn your server, searchable, permanent
QUOTE COMPARISON SHEET 4 / 7 DATA: CUSTOM MACHINE BUILDER AVG.

Three artifacts. Per RFQ.

What lands on your estimator's desk the day the customer's packet arrives - ready to defend in a quote review and tweak in your existing templates.

Deliverable 01
Feasibility Verdict
The answer to "have we built this before?" - backed by confidence score, the 3–5 closest past machines, where the analogue holds, and where it stops. Plus the clarification questions worth sending the customer.
  • Confidence score with rationale
  • Closest past builds with outcomes
  • Process capability gap analysis
  • Spec-driven clarification questions
Deliverable 02
Modular Reuse Map
The 70/30 split for this specific machine: which modules carry over from your library, which components need redesign, and where the long-lead risk lives.
  • BOM modular-reuse percentage
  • Long-lead component flags + alternatives
  • Customer-specific module list
  • Supplier risk against past PO data
Deliverable 03
Per-Module Estimate
The quote your estimator would have spent five weeks building. Module-by-module Bill of Process, Bill of Equipment, material, labor, ±band - with confidence rolled up to a defensible top line.
  • Module-level BOP & BOE
  • Material + labor + assembly cost
  • ±Band per module + composite
  • Export to .xlsx / your estimating tool

A library that compounds
across every machine you build.

The first machine you load teaches the system one segment. The twentieth makes you faster than anyone trying to enter your market. The fiftieth becomes a moat no competitor can shortcut.

PHASE 01
5 machines
Segment Memory
System learns one machine family - dial assembly, packaging line, medical device cell. Recognizes the modular base architecture and the customer-specific tail. First wins.
PHASE 02
20 machines
Cross-Industry Recall
System sees the analogue between a packaging filler workhead and a pharma dosing workhead. Modular reuse extends across customer verticals. The 70% modular ratio creeps up to 78%.
PHASE 03
50+ machines
Builder's Moat
Your past 50 builds are a private intelligence layer. New engineers ramp on day one. Long-lead supplier risk is priced in. Feasibility verdicts are defensible against any competitor quote.

Your senior designer takes four weeks to quote one custom machine today. With Mavlon, the same head supports four - and the fifth one doesn't make her tired. That's how custom-machine quoting compounds.

Montanstahl Group, Switzerland

How a multi-site Swiss engineering group answered "can we make this?" in seconds instead of days

Montanstahl's estimators across Switzerland, Germany, and Italy spent thousands of hours per year on the same question - "have we done this kind of profile / process / spec before, and at what cost?" - by digging through old quotes and tribal memory.

Mavlon embedded into their existing workflow, parsed each new packet on arrival, and surfaced the closest past jobs with prices, capabilities, and outcomes. The same memory-first quoting motion generalizes directly to custom machine builders across packaging, medical, semi, and aerospace tooling verticals.

>85%
Pilot Accuracy
Hours
vs. Weeks
1000s
Hours Saved / Yr
7-fig
Annual Upside (est)
Swiss Precision Metals · Aerospace, Motorsport, Energy · Multi-plant · Since 1983

"What previously required emails, phone calls, and digging through old RFQs is now answered in seconds for standard and semi-standard cases."

Read the full case study
"

Every customer thinks their machine is unique. Every engineer knows it's 70% the same as the last one. The job isn't to build something new every time. The job is to know precisely which 30% is actually new - and to know it on the first day, not the eightieth.

Head of Engineering - Custom Machine Builder

Built for Custom Machine Builders
ISO 27001 (In Progress)
GDPR Compliant
DPA with OpenAI · Anthropic · Google
On-Premise Deployment
No-Train Redaction Pipeline
SOC 2 Pending

Embeds in Outlook · Exports to SolidWorks PDM · SAP · Epicor · Excel - or your estimating template. ISO 13485 / FDA 21 CFR 11 ready for medical device builds.

Three past machines.
One week to pilot.
See feasibility in hours.

Sign NDA. Share three past machines from one segment - packaging, medical, semi, aerospace tooling, whichever you build most. We stand up the memory layer on your server in a week. 80% accuracy target on real RFQs. Your senior engineers approve the 30%.

NDA first. Your data, your server. IP transfers to you on day one.

Every custom machine builder is staring at the same demographic curve: the senior who carried the modular-reuse library in his head is retiring. The builders who institutionalize that memory now will out-quote the rest before the new estimators even learn the supplier names.
MAVLON SHEET 7 / 7 END OF PACKAGE 2026