Check it against proposals you have already sent.
Before it touches a live RFP, we run it on past battery storage jobs your team has already priced, with the pass mark agreed in writing first.
- Pick one kind of job you bid often, such as batteries for commercial sites or larger grid-connected systems.
- Set aside past RFPs whose proposals the engine never sees.
- The engine prices them from the raw documents.
- Compare its totals with the prices your team actually sent.
A US manufacturer of engineered waterfront structures went live in production after a test like this. Its drafts land within about 2 to 3 percent of its own price on familiar product lines, and within about 10 to 15 percent on brand-new jobs with many add-ons.