SHEET 1/7

For Sheet Metal Fabricators

We read your sheet metal drawings.
You quote faster.

Upload a drawing. Get bend angles, hole patterns, flat pattern dimensions, material specs, and edge requirements extracted in minutes. First-off inspection report, automated.

First drawing free · No credit card

MAVLON SHEET 1 / 7 REV 1.0 2026
The Drawing

What your estimator sees every morning

480.0 ±0.5 280.0 240.0 ±0.3 4× ∠ 90° ±0.5° R3 6× Ø6.5 ±0.1 Deburr all edges SM-EN-2024-001 · Al 5052-H32 · ISO 2768mk · Flat Pattern + 4 Bends
Flat pattern + 4 bends · 28 dimensions · 6 hole pattern · grain critical
The Extraction - minutes

What Mavlon sees instantly

Material
Al 5052-H32  ·  2.0mm sheet  ·  Mass 1.42 kg
Flat Pattern
480.0 ±0.5 × 280.0 ±0.5 mm
Folded
240 × 180 × 60 mm (post-bend)
Bends
4 × 90° ±0.5°  ·  R3 inner radius  ·  K-factor 0.42
Holes
6 × Ø6.5 ±0.1  ·  20mm grid (pattern)
Edges
Deburr all edges  ·  No sharp corners
Surface
Mill finish  ·  Powder coat RAL 9005 matte
Standards
ISO 2768-mK  ·  ISO 13920  ·  DIN 6930
Notes
Grain along long axis  ·  Critical for spring-back

A missed bend angle isn't a rework.
It's a scrap batch.

Every dimension your estimator misses during extraction is a tolerance your press brake operator might violate. In sheet metal, the cost compounds across the entire run.

1
MISSED: ∠ 90° ±0.5° R3
Scrap Batch
Bend angle tolerance missed. Press brake set to ±2°. First 80 parts bent before first-off catches it. Re-bend not possible - all 80 scrap.
↳ $9,600 material + 2 days re-run
2
MISSED: Grain Direction
Bend Cracking
Grain direction note missed. Laser program orients blanks wrong. Bend lines run across grain. Cracks at tight-radius bends. Quality hold on 200 units.
↳ Full re-run + customer hold
3
MISSED: 6× Ø6.5 Pattern
Assembly Failure
Hole pattern position tolerance missed in quoting. Holes drilled individually at standard tolerance. Mating part won't fit. Assembly line stops.
↳ -22% margin + lost reorder
RISK ANALYSIS SHEET 3/7 CLASSIFICATION: CRITICAL

The same sheet metal drawing.
Two realities.

Your Shop Today With Mavlon
First-off prep time 30–90 min 5 min review
Bend tolerance verification Manual angle gauge each bend Auto-extracted from drawing
Hole pattern handling Manual count, re-type each Auto-grouped pattern
Flat pattern dimensioning Re-typed into Excel Direct export to laser/punch
Material grain direction Easy to miss in general notes Flagged as critical
Setup approval throughput 2 per day 6+ per day
Quote turnaround on new RFQ 1–3 days Same-day response
PROCESS COMPARISON SHEET 4/7 DATA: PRODUCTION AVERAGES

What you actually get.

Upload one drawing. Receive three verified deliverables. Your quality engineer reviews in 30 minutes instead of building from scratch in 8 hours.

Deliverable 01
First-Off Inspection Report
Pre-populated setup approval form. Every flat pattern dimension, bend angle, hole pattern, and edge requirement - with tolerances and inspection methods filled in.
  • Bend angle + radius captured
  • Hole patterns auto-grouped
  • ISO 2768 size-dependent lookup
  • Export-ready .xlsx
Deliverable 02
Quoting Cost Sheet
Drawing dimensions injected into your cost-calc Excel template. Material weight, surface area, bend count, hole count - ready for your shop's pricing logic.
  • Flat pattern area + mass
  • Operations count (bends, holes, cuts)
  • Material spec verified
  • Maps to your Excel template
Deliverable 03
Manufacturing Flags
Risks surfaced before you commit to a quote. Grain direction, spring-back risk, weld joint accessibility, tight-radius bends - flagged with severity.
  • Grain + spring-back warnings
  • Tight-radius bend flags
  • Material spec mismatches
  • Customer-specific clarifications

Intelligence that
compounds.

Every drawing becomes permanent, searchable institutional memory. The advantage builds exponentially.

PHASE 01
100 drawings
Pattern Recognition
System recognizes part families, common tolerancing patterns, and recurring material specs across your projects.
PHASE 02
1,000 drawings
Institutional Memory
Historical pricing, feasibility data, and supplier patterns surface automatically on every new RFQ.
PHASE 03
5,000+ drawings
Competitive Moat
No competitor can shortcut, buy, or hire this intelligence layer. It is yours alone.

Your quality engineer processes 1 complex FAI per day. Your estimator reads 3 drawings before lunch. With Mavlon, they do 3x the work without working harder.

Montanstahl Group, Switzerland

How a Swiss precision metals group eliminated the RFQ feasibility bottleneck across 3 production sites

Montanstahl's estimating team across Switzerland, Germany, and Italy spent thousands of hours per year answering the same question on every fabrication RFQ: "Can we make this?"

Mavlon gave them the answer in seconds, embedded directly in their existing workflow, without replacing expert judgment where it matters.

>85%
Accuracy
Seconds
vs. Hours
1000s
Hours Saved
7-fig
Annual Upside (est)
Swiss Precision Metals Group · Aerospace, Motorsport, Energy · Since 1983

"What previously required emails, phone calls and digging through old RFQs is now answered in seconds for standard and semi-standard cases."

Read the full case study
"

Re-typing the same flat pattern dimensions into Excel for every quote was killing us. We needed a way to skip the typing and let our estimator focus on whether we can actually make it.

Technical Manager - UK Sheet Metal Fabricator

Built for Sheet Metal Fabrication
ISO 2768mk
ISO 13920
DIN 6930
IATF 16949
Setup Approval
On-Premise Available

Exports to Clipper · SAP · Epicor · JobBOSS · Excel - or your ERP.

One sheet metal drawing.
Sixty seconds.
See it yourself.

Upload a sheet metal drawing. Get bend angles, hole patterns, flat pattern dimensions, edges, and material specs extracted in minutes. First-off inspection report ready. First drawing is free.

No signup. No slides. Your drawing, fully analyzed in seconds.

The first sheet metal fabricator in your region to automate drawing extraction quotes faster. They win the work. The rest spend the next decade re-typing dimensions into Excel.
MAVLON SHEET 7/7 END OF PACKAGE 2026